Fit-out and refurbishment of workplaces in Montevideo and Maldonado, without disrupting daily operations.

Office renovations

Office renovations in Montevideo and Maldonado, phased and outside business hours when required.

Grupo Edifica carries out office renovations for companies, professional firms and institutions in Montevideo and Maldonado: space reconfiguration, partition walls, upgraded building services and finishes. Each project is planned in phases and, when operations require it, carried out at night or outside business hours, with an in-house team and a technical director responsible for the entire process.

An office renovated while it keeps working

The office keeps running during the works. The company states its needs; technical direction plans and answers for it.

An office renovation is rarely carried out in an empty space. In most cases, staff continue working, IT equipment remains in use and client service cannot be suspended. Every poorly planned day on site translates into unusable workstations, relocated meetings and internal time spent dealing with unforeseen issues.

In addition, coordination of the works often falls to administrative departments whose role is not to manage contractors, procurement or schedules. When several suppliers are hired separately, the company ends up acting as coordinator of a process it does not know in detail.

Grupo Edifica takes on that coordination in full. The company defines what it needs; the technical director plans, executes and is accountable for the result.

What an office renovation includes

  • Desks, rooms and areas reorganised around the current team and way of working.

    Reorganisation of workstations, meeting rooms, private offices, reception areas, break areas and service areas, to adapt the office to the number of people and to the company's current way of working.

  • Drywall partitions and ceilings: less debris and shorter timelines.

    Construction, modification and removal of lightweight partitions to divide or connect spaces, together with ceilings and wall linings in drywall systems. These systems allow the layout to be changed with less debris, less construction moisture and shorter lead times than traditional masonry.

  • Updated finishes and services without redoing the layout.

    When the overall structure of the office is retained, the renovation focuses on updating what already exists: refurbishing rooms, renewing finishes, upgrading services and resolving specific problems without redesigning the floor plan.

    • Electrical installation and distribution boards
    • Cabling routes for data and telephony
    • Plumbing for staff bathrooms and kitchens
    • Flooring and wall finishes
    • Painting
    • Joinery, doors and windows, and glazing
    • Diagnosis and treatment of damp and cracks
  • Works by sector, at night, at weekends or outside business hours.

    Planning of the works by sector and execution at night, at weekends or outside business hours, according to each company's operations.

Space reconfiguration

Desks, rooms and areas reorganised around the current team and way of working.

Reorganisation of workstations, meeting rooms, private offices, reception areas, break areas and service areas, to adapt the office to the number of people and to the company's current way of working.

Partition walls and lightweight structures

Drywall partitions and ceilings: less debris and shorter timelines.

Construction, modification and removal of lightweight partitions to divide or connect spaces, together with ceilings and wall linings in drywall systems. These systems allow the layout to be changed with less debris, less construction moisture and shorter lead times than traditional masonry.

Adaptation of the existing layout

Updated finishes and services without redoing the layout.

When the overall structure of the office is retained, the renovation focuses on updating what already exists: refurbishing rooms, renewing finishes, upgrading services and resolving specific problems without redesigning the floor plan.

Upgrade of building services and finishes

  • Electrical installation and distribution boards
  • Cabling routes for data and telephony
  • Plumbing for staff bathrooms and kitchens
  • Flooring and wall finishes
  • Painting
  • Joinery, doors and windows, and glazing
  • Diagnosis and treatment of damp and cracks

Phased and after-hours execution

Works by sector, at night, at weekends or outside business hours.

Planning of the works by sector and execution at night, at weekends or outside business hours, according to each company's operations.

Planning the works around operations

Works are phased: one sector is cleared, renovated, handed back in use, then the next begins.

Planning begins with understanding how the office works: service hours, areas that cannot stop, peak activity periods and the number of people in each sector. With that information, the works are divided into phases that make it possible to vacate a sector, renovate it, hand it over ready for use and move on to the next.

  1. Works by sector

    Each sector relocates during its works; the office always stays operational.

    Staff in each sector are temporarily relocated while their area is being renovated, and return to a finished space. Part of the office remains operational at all times.

  2. Night and weekend works

    Noisy work is done after hours; each morning the space is ready to use.

    The tasks that generate the most noise, dust or movement of materials, such as demolition, cutting, installation runs and painting, are concentrated outside business hours. At the start of each working day, the space is left tidy and ready for use.

  3. Dust and noise control

    Work areas sealed off, equipment protected and cleaning at the end of each day.

    Isolation of work areas, protection of furniture and IT equipment, cleaning at the end of each shift and movement of materials along defined routes, so that the works do not affect those who continue working.

  4. Coordination with the company

    A single technical lead gives advance notice of every phase.

    A technical manager gives advance notice of each phase, the sectors affected and the working hours, and is the company's single point of contact throughout the works.

What is resolved during the works

Electrical and data installations for workstations

Power and data at every desk, with cabling routes that allow growth without new works.

Each workstation needs power outlets, a data connection and, in many cases, telephony. The renovation defines the location of workstations before installations are run, and provides cabling routes through the floor, ceiling or partitions so that workstations can be added or relocated in the future without further works. The electrical installation is sized according to the number of devices and organised into separate circuits for lighting, general outlets and IT equipment.

Air conditioning and lighting as integrated equipment

Air conditioning and lighting planned within the same renovation.

Reconfiguring an office changes the way air and light are distributed. For this reason, air conditioning and lighting are planned within the same renovation rather than as later works: location of air conditioning units and their drains, pipe routes, position of light fittings according to workstations and meeting rooms, and the appropriate lighting level for each task. Grupo Edifica is responsible for selecting, purchasing and installing the equipment.

Offices in managed buildings

Coordination with building management on the company's behalf.

Offices located in condominium buildings or in corporate buildings with a building management require the works to be coordinated with the management and to comply with the building's conditions: permitted hours for noisy work, use of lifts and service elevators, protection of common areas, debris removal and access to shared installations. Grupo Edifica handles that coordination on the company's behalf, from submitting the works to their completion.

Renovation, design and equipment in a single project

Renovation, interior design and equipment under one technical direction, plus service agreements for corporate offices.

An office renovation can be complemented by an interior design project based on the company's visual identity and by the complete fit-out and equipment of the spaces. The three disciplines are coordinated under a single plan and a single technical director.

For companies with one or more locations that need renovations, equipment and maintenance on an ongoing basis, there is a specific service agreement for corporate offices.

Team

Over 25 years' experience, an in-house team and work for Kaplan and OX Desarrollos.

More than 25 years of combined experience in construction, site management, technology and project management. An in-house execution and installation team. Track record in the complete fit-out and equipment of residential buildings for real estate developers such as Kaplan and OX Desarrollos.

Frequently asked questions

Yes. The works are divided into phases by sector, and the tasks that generate the most noise and dust are carried out at night, at weekends or outside business hours. While one sector is being renovated, the rest of the office continues to operate, and each area is handed over ready for use before moving on to the next.

They make it possible to divide or connect spaces with less debris, less construction moisture and shorter lead times than traditional masonry. They also make future layout changes easier and allow electrical and data installations to run inside the partitions.

Yes. The renovation includes the electrical installation, distribution boards and data and telephony cabling routes for each workstation, planned according to the agreed layout and allowing workstations to be added or relocated in the future.

Grupo Edifica handles coordination with the building management: authorised hours, use of lifts, protection of common areas, debris removal and access to shared installations. The company does not need to be involved in that process.

Each renovation has an assigned technical manager who plans the works, directs execution, coordinates all trades and is the company's single point of contact. Progress is reported at each stage of the schedule.

Montevideo and Maldonado, including Punta del Este, José Ignacio and La Barra.

Contact

Let us arrange a meeting to understand your needs and assess the most suitable solution for your project.