Grupo Edifica
Businesses and institutions

Corporate office renovation and design

Offices aligned with the company's identity, delivered without disrupting operations.

Workspaces aligned with the company's identity and operations, delivered without interrupting business activity.

Corporate office renovation and design

Office design, renovation, fit-out and maintenance in Montevideo and Maldonado, phased and after hours.

Grupo Edifica designs, renovates, fits out and maintains corporate offices in Montevideo and Maldonado, for companies with one or several sites. It integrates interior design based on the company's visual identity, space reconfiguration, custom corporate furniture, climate control, lighting and maintenance, with work carried out in stages and outside working hours.

An office that does not keep pace with the company has a daily cost

Spaces that have fallen behind

Teams and ways of working change; the old layout stops working.

Companies change faster than their offices. Teams that grow or shrink, new ways of working, more meetings, fewer fixed workstations and a greater need for focus spaces mean that a layout designed years ago no longer fits. The result shows in poorly placed workstations, insufficient meeting rooms, congested circulation and unused areas.

An image that does not represent the brand

An outdated office conveys a different image than the brand.

The office is where clients, suppliers and job applicants get to know the company from the inside. A space unrelated to the visual identity, with dated finishes or mismatched furniture, conveys a different message from the one the company communicates through its other channels.

Works that affect productivity

Works during office hours can cost more in productivity than the works.

A renovation carried out during the working day means noise, dust, relocated workstations and interrupted meetings. When the works are not planned around operations, the cost in lost productivity can exceed that of the intervention itself.

Coordination by departments not equipped for it

Admin staff end up coordinating technical trades with no one in charge.

Managing works, furniture purchases and climate control suppliers usually falls to administrative or human resources departments, which must coordinate technical trades without specific training and without a single party accountable for the whole.

What the agreement offers

  1. Interior design based on visual identity

    Brand identity drives the design, with renders approved before works.

    The design starts from the company's visual identity: colours, materials, tone and brand values are translated into decisions on space, finishes, furniture and lighting. The process includes a site survey, proposal, detail drawings and professional renders with review stages, so that management can approve the result before works begin.

  2. Reconfiguration with partition walls and lightweight structures

    Lightweight partitions: faster, cleaner works and adaptable spaces.

    Space reconfiguration is achieved with partition walls and lightweight structures, which allow workstations, meeting rooms, focus spaces, break areas and reception to be reorganised with faster and cleaner interventions than traditional masonry, and with the possibility of adapting the space again in the future.

  3. Custom corporate furniture

    Custom furniture designed, supervised in production and installed.

    Reception, workstations, meeting rooms, storage areas and common spaces with furniture designed for the space and for the way the company works. Grupo Edifica designs the furniture, obtains quotes from the specialised workshops that manufacture it, supervises manufacture, coordinates installation and manages after-sales service.

  4. Climate control and lighting

    HVAC and lighting sized to layout, occupancy and task, brand-independent.

    Climate control is sized according to the new layout, occupancy and orientation of each area. Lighting is designed for each type of task, distinguishing workstations, meeting rooms and common areas, with a direct impact on staff comfort. Equipment selection is brand-independent.

  5. Execution in stages and outside working hours

    Phased works, with noisy tasks at night or on weekends.

    The works are divided into stages that allow the office to remain operational, with noisy or invasive work scheduled at night, at weekends or outside working hours. Each stage is handed over ready for use.

  6. Relocations and fit-out of new offices

    New office ready before the move: design, works and fit-out.

    When the company relocates, Grupo Edifica fits out the new office before the move: design, construction, furniture, climate control and lighting, coordinated so that the company moves into a finished space.

  7. Maintenance of installations and equipment

    Maintenance across one or more sites, one point of contact, reports.

    Preventive and corrective maintenance of installations, climate control, lighting and furniture, at one or several sites, with a single responsible party and reports on the work carried out.

How it works

  1. 01

    Site survey

    Survey of the space, ways of working and visual identity.

    Survey of the space, its installations and the way teams work, and analysis of the company's visual identity.

  2. 02

    Design

    Layout, interiors, furniture, HVAC and lighting, with renders.

    Proposal for layout, interior design, furniture, climate control and lighting, with renders and revisions until approval.

  3. 03

    Budget and staging plan

    Itemized budget and phased schedule based on operations.

    Detailed budget by trade and a staged schedule, defined around the company's operations.

  4. 04

    Execution

    Works and installations by our team, after hours when needed.

    Construction, supervised furniture manufacture and installations by our own team, outside working hours where appropriate.

  5. 05

    Handover and maintenance

    Handover in stages, warranty management and subsequent maintenance as set out in the agreement.

What the company gains

The team keeps working during the works

Renew the office without stopping work or relocating staff.

Phased execution, at night or on weekends, makes it possible to renovate or reconfigure the office without halting operations or relocating staff.

Administrative areas removed from works management

Admin staff stop coordinating trades, suppliers and claims.

Administrative staff no longer coordinate trades, suppliers and claims, a task for which they are not trained and which diverts them from their role.

Spaces that adapt to growth

Spaces that can be reconfigured without touching the structure.

Partition walls and lightweight structures make it possible to reconfigure workstations, meeting rooms and areas as the organization changes, without altering the building's structure.

An office consistent with the company

A space with identity that improves visits and daily work.

A space designed around the company's identity shapes the experience of clients and visitors, and improves working conditions for the team.

What can be resolved in an office

  • Interior design based on visual identity
  • Reconfiguration of workstations, meeting rooms and common areas
  • Partition walls and lightweight structures
  • Reception areas and meeting rooms
  • Custom corporate furniture, manufactured by specialised workshops with design and supervision by Grupo Edifica
  • Electrical and plumbing installations
  • Bathrooms and kitchenettes
  • Flooring, wall finishes, painting, carpentry, doors and windows, and glazing
  • Air conditioning and lighting
  • Fit-out of new offices prior to relocation
  • Preventive and corrective maintenance

Team

Over 25 years of experience, in-house team and work for Kaplan and OX Desarrollos.

More than 25 years of combined experience in construction, site management, technology and project management. In-house construction and installation team. Track record in the comprehensive fit-out of residential buildings for real estate developers such as Kaplan and OX Desarrollos.

Frequently asked questions

Yes. The works are divided into stages and noisy or invasive tasks are carried out at night, at weekends or outside working hours. Each stage is handed over ready for use before the next one begins.

The design starts from the company's visual identity and translates it into colours, materials, finishes, furniture and lighting. The proposal is presented with professional renders and review stages prior to approval.

No. Grupo Edifica designs the furniture, obtains quotes from the specialised workshops that manufacture it, supervises manufacture, coordinates and supervises installation, and manages after-sales service.

Because they allow the office to be reconfigured with less construction time, less waste and less impact on activity than traditional masonry, and they make future layout changes easier.

Yes. The complete fit-out of the new office is designed and carried out, including construction, furniture, climate control and lighting, so that the company moves into a finished space.

It can. Preventive and corrective maintenance of installations, climate control, lighting and furniture is defined in the agreement, for one or several sites, with reports on the work carried out.

Montevideo and Maldonado, including Punta del Este, José Ignacio and La Barra.

Contact for corporate offices

Let us arrange a meeting to learn about your office and assess the scope of the intervention.

Step 1 of 2

By submitting this form you accept the Privacy policy. Your data is used solely to respond to your inquiry.

WhatsApp +598 99 962 791directiva@edifica.uy
Offices in Montevideo and Maldonado