School renovation and maintenance
Public and private schools and universities, with works scheduled around the academic calendar.
Schools, secondary schools, institutes and universities, public and private, with works scheduled around the academic calendar.
Renovation, fit-out and maintenance of school buildings under one annual agreement and technical lead.
Grupo Edifica plans and carries out renovations, fit-out and maintenance of educational buildings in Montevideo and Maldonado: private schools, secondary schools, primary schools, training institutes and universities, both public and private. The service is structured as an annual agreement that organises interventions around the academic calendar, with a single technical direction accountable to the institution's leadership for the construction, equipment and maintenance of the building.
A building that never stops and a calendar that allows no delays
Heavy use, short breaks and old buildings: school leaders should not have to manage works.
An educational building withstands intensive use for most of the year. Hundreds of people move through the same corridors, stairways, restrooms and playgrounds every day, which accelerates wear on flooring, wall coverings, doors and windows, sanitaryware and installations. When maintenance is postponed, minor problems turn into more costly repairs.
Construction work also has limited time windows. The summer break and the July winter holidays are the only periods in which classrooms, restrooms or dining halls can be worked on without affecting classes. Works that are not completed on time force the institution to reorganise groups, close off spaces or start the school year with areas out of use.
Added to this is the age of many buildings. Structures with decades of use present rising damp or leaks, cracks, electrical and plumbing installations that no longer meet current demand, and spaces that no longer suit teaching needs. The institution's leadership, whose role is to educate, ends up spending time coordinating suppliers, reviewing quotes and handling complaints about the works.
What the agreement offers
Building assessment and annual intervention plan
Full survey and a prioritised plan of works.
A complete survey of the building, its installations and its equipment. Each problem identified is recorded and classified according to its urgency, its impact on safety and operations, and its estimated cost. The result is a prioritised intervention plan that allows the institution to decide, on the basis of technical information, what is resolved in each break and what is scheduled for the following period.
Works concentrated in school breaks
Major works run during breaks, fully planned in advance.
Larger interventions are scheduled for the summer break and the July winter holidays. Planning, definition of materials and purchase of equipment are carried out in advance, so that the break is devoted entirely to execution and the building is handed over in proper condition before students return.
Work during term time with safety safeguards
Urgent work is done in isolated areas, without disrupting classes.
When an intervention cannot wait for the break, it is carried out with physical isolation of the work area, signage, alternative routes for students and staff, and schedules coordinated with the leadership so that the noisiest tasks or the movement of materials take place outside class hours.
Preventive and corrective maintenance throughout the year
Regular inspections and repairs through a single contact channel.
Regular inspection of installations, roofs, drains, doors and windows and equipment, and handling of corrective repairs through a single communication channel. Preventive maintenance reduces emergency interventions and makes it possible to anticipate upcoming repairs in the annual plan.
How it works
- 01
Site survey
Site visit, meeting with leadership and a record of building condition.
Technical visit to the building, meetings with the leadership and with those responsible for each area, and recording of the condition of every space, installation and piece of equipment.
- 02
Intervention plan
Prioritised proposal with costs by trade and phase.
A proposal prioritised by urgency and execution period, with a budget broken down by trade and by stage.
- 03
Preparation
Design, materials and purchasing settled before the break.
Design, definition of materials, purchase of equipment and coordination of suppliers before the break begins.
- 04
Execution
Works by our own team, with progress reports to leadership.
Construction, installations and fit-out by our own team, under technical direction and with progress reports to the institution's leadership.
- 05
Handover and follow-up
Handover before classes and maintenance through the year.
Handover of spaces before classes begin, maintenance throughout the year and management of warranties on installed equipment throughout their term.
What the institution gains
Works without losing school days
Works during breaks; urgent jobs in isolated areas.
Interventions are planned during the year and carried out during school breaks. Anything that cannot wait is addressed with isolated, signposted areas, without suspending activities.
Repairing the cause, not the symptom
Diagnosing early costs less than repairing every year.
Damp or a deteriorated installation that is diagnosed and treated in time costs less than the damage it causes if postponed. A technical diagnosis avoids repairs that must be repeated every year.
Predictable building investment
A prioritised plan spreads investment across the year.
A prioritized intervention plan makes it possible to spread investment across the year or the fiscal period, rather than responding to emergencies.
Safety of the school community
Isolated areas and coordinated hours protect the school community.
Isolated work areas, defined circulation routes and schedules coordinated with school management protect students, teachers and staff during the works.
Private and public institutions
Private institutions
Direct contracting, with an agreement tailored to building and budget.
Private schools, institutes and universities contract directly. The agreement is tailored to the building and its budget, with an annual or multi-year intervention plan and maintenance terms adjusted to the institution's operations.
Public institutions
Public procurement:
Public primary schools, secondary schools, institutes and university centres contract through state procurement procedures.
Scope of intervention
Spaces
- Classrooms
- Laboratories and workshops
- Libraries and study rooms
- Restrooms and changing rooms
- Dining halls and kitchens
- Playgrounds and outdoor spaces
- Gymnasiums and sports facilities
- Administrative areas and staff rooms
Construction and building pathology
- Diagnosis and treatment of damp and cracks
- Masonry, partition walls and space reconfiguration
- High-traffic flooring and wall coverings
- Interior and exterior painting
- Carpentry, doors, windows and glazing
- Renewal of plumbing and electrical installations
- Accessibility upgrades: ramps, entrances, accessible restrooms and circulation routes
Fit-out and equipment
- Climate control for classrooms and common areas
- Lighting for classrooms, libraries and circulation areas
- Water heaters, sanitaryware and faucets and fittings
- Kitchen and dining hall equipment
- Educational furniture and custom furniture
Team
More than 25 years of combined experience in construction, site management, technology and project management. In-house construction and installation team. Track record in the comprehensive fit-out of residential buildings for real estate developers such as Kaplan and OX Desarrollos.
Frequently asked questions
It is advisable to begin the site survey and scope definition during the second half of the academic year. In this way, the design, budget approval and purchase of materials and equipment are completed before the break, and the holiday period is devoted entirely to execution.
Yes, when the intervention cannot wait for the break. The work area is physically isolated and signposted, alternative routes are defined for students and staff, and the noisiest tasks or the movement of materials are coordinated with the leadership to take place outside class hours.
A record of the building's condition, the list of necessary interventions classified by urgency, the planned period for each one and its budget broken down by trade. The institution approves the plan and decides the order of execution according to its priorities and budget.
First, its source is diagnosed: rising damp, leaks from roofs or façades, leaks from installations or condensation. Each cause requires a different treatment. Grupo Edifica's management holds a specialisation in Building Pathology, which makes it possible to address the cause and not just the symptom, avoiding repairs that recur every year.
Yes. Grupo Edifica selects and manages the purchase of educational furniture and designs custom furniture for libraries, laboratories or specific areas. Manufacturing is carried out by specialist manufacturers; Grupo Edifica provides the quotes, supervises manufacture and coordinates installation.
An assigned technical lead who directs execution, coordinates all trades, reports progress to the leadership and centralises communications and complaints during the works and maintenance.
Montevideo and Maldonado, including Punta del Este, José Ignacio and La Barra.
Contact for educational institutions
Let us arrange a meeting with the institution's leadership to survey the building and define an intervention plan around the academic calendar.