Grupo Edifica

Healthcare facility renovations

Hospitals, clinics and medical practices, renovated without interrupting care.

Hospitals, private hospitals, clinics, mutual healthcare providers, outpatient clinics and medical offices, with works carried out without interrupting patient care.

Healthcare facility renovations

Renovation, non-medical equipment and maintenance for healthcare buildings in Montevideo and Maldonado, without interrupting care.

Grupo Edifica carries out renovations, non-medical fit-out and maintenance of healthcare buildings in Montevideo and Maldonado: hospitals, private hospitals, clinics, mutual healthcare providers, outpatient clinics, health centres and medical offices. Each intervention is planned by sectors and carried out alongside patient care, under a single technical direction that coordinates with the institution's management and with those in charge of each service.

Construction work alongside patient care

A health centre never closes: dust, noise or an unplanned outage directly affect patients and services.

A healthcare facility never closes. Consultations, inpatient care, diagnostic tests and support services operate every day, many of them around the clock. Any renovation, however limited, is carried out alongside patients, companions and healthcare staff who cannot be relocated.

In this setting, site conditions that would be tolerable in another building become critical. Dust affects the hygiene of the spaces and the health of vulnerable people. Noise interferes with the rest of inpatients and with the work of healthcare professionals. An unscheduled interruption of power, water or climate control compromises services that depend on those installations. Poorly placed material storage obstructs a necessary circulation route.

In addition to technical requirements, there is the demand for coordination. Each service has its own schedules, priorities and person in charge. Works in a healthcare facility require agreeing with each of them when, where and how the intervention will take place, and sustaining that coordination throughout execution. When this task falls on the institution's staff, it takes time away from healthcare management.

What the agreement offers

  1. Construction planning by sectors

    Work in successive sectors: while one is under works, the rest keeps operating.

    The building is divided into intervention sectors that are carried out in succession. While one sector is under construction, the rest remains in operation. The sequence is defined together with the institution's management, according to care needs and the possibility of temporarily relocating each service.

  2. Control of site conditions

    Temporary enclosures, constant cleaning and noisy tasks at low-activity hours.

    Physical isolation of each sector with temporary enclosures, dust control with continuous cleaning of the work area and its access points, scheduling of the noisiest tasks during the hours of lowest activity, and orderly removal of debris and construction waste.

  3. Separate circulation routes

    Site, material and waste routes kept apart from patient and staff circulation.

    Separate routes for construction personnel, delivery of materials and removal of waste, so that they do not cross the circulation routes of patients, companions and healthcare staff.

  4. Continuity of installations

    Work on building services is scheduled and announced to avoid unplanned outages.

    Any intervention on electrical, plumbing or climate control installations is scheduled in advance, communicated to those in charge of the services involved and carried out at the agreed times, with the aim of avoiding unplanned interruptions in areas that depend on them.

  5. Preventive and corrective maintenance

    Periodic inspection of services and equipment, with repairs through a single channel.

    Regular inspection of installations, finishes, doors and windows, sanitaryware and climate control equipment, and handling of corrective repairs through a single channel, with the same approach to coordination and control of site conditions that governs the construction works.

How it works

  1. 01

    Site survey

    Site visit, meetings with management and services, and condition survey.

    Technical visit, meetings with the management and with those in charge of each service, and recording of the condition of the spaces, installations and equipment.

  2. 02

    Sector plan

    Sectors, sequence, hours, routes and dust and noise control for each stage.

    Definition of the work sectors, their sequence, working hours, circulation routes and dust and noise control measures for each one.

  3. 03

    Budget and schedule

    Budget by trade and sector, with a schedule coordinated with the institution.

    Budget broken down by trade and by sector, with an execution schedule coordinated with the institution's operations.

  4. 04

    Execution

    In-house works under technical direction, in constant contact with each service.

    Construction and installations by our own team, under technical direction and in constant communication with those in charge of each service.

  5. 05

    Handover and maintenance

    Handover by sector, final cleaning, warranties and maintenance throughout the contract.

    Handover of each sector ready for use, final site cleaning, management of warranties on installed equipment throughout their term, and maintenance for the duration of the contract.

What the institution gains

Care does not stop

Works by sector so services keep running and appointments aren't postponed.

Works are planned by sector so that services remain operational. Avoiding the closure of an area avoids postponing consultations, referring patients elsewhere and losing that service's activity.

Controlled construction risks

Area isolation and dust and noise control reduce the impact on patients and staff.

Area isolation, dust and noise control, and separate circulation routes reduce the impact of the works on patients and staff in an environment that demands strict hygiene conditions.

A single point of coordination with the institution

One technical lead agrees hours, stages and access with management and each service.

A technical lead agrees schedules, phases and access with management and with each service, rather than each supplier negotiating separately.

Fewer failures in critical installations

Planned maintenance that reduces unexpected failures in care-critical areas.

Planned maintenance of climate control, lighting and installations reduces unexpected interruptions in areas where a failure directly affects patient care.

Scope of intervention

Spaces

  • Consulting rooms
  • Waiting rooms and reception areas
  • Inpatient areas
  • Patient, public and staff restrooms
  • Service areas, changing rooms and staff rooms
  • Administrative and management areas
  • Circulation routes and entrances

Construction and finishes

  • Partition walls and space reconfiguration
  • Easy-to-clean flooring and wall coverings
  • Painting
  • Carpentry, doors, windows and glazing
  • Renewal of plumbing and electrical installations
  • Diagnosis and treatment of damp and cracks
  • Accessibility upgrades: entrances, restrooms and circulation routes

Non-medical fit-out and equipment

  • Climate control
  • Lighting for consulting rooms, wards and circulation areas
  • Water heaters, sanitaryware and faucets and fittings
  • Appliances for service and staff areas
  • Furniture for waiting rooms, consulting rooms and administrative areas
  • Custom furniture for reception desks and service counters

Team

Over 25 years of combined experience, in-house team and projects for Kaplan and OX Desarrollos.

More than 25 years of combined experience in construction, site management, technology and project management. In-house construction and installation team. Track record in the comprehensive fit-out of residential buildings for real estate developers such as Kaplan and OX Desarrollos.

Frequently asked questions

The works are divided into sectors that are carried out in succession. While one sector is under construction, the rest of the healthcare facility operates normally. The sequence, working hours and circulation routes are agreed in advance with the management and with those in charge of each service.

Each sector is isolated with temporary enclosures, the work area and its access points are cleaned continuously, waste is removed along separate routes and the noisiest tasks are scheduled during the institution's hours of lowest activity.

Yes. When the operation of the service requires it, tasks are carried out at night, at weekends or during the periods of lowest activity defined by the institution.

Every intervention on electrical, plumbing or climate control installations is scheduled in advance, communicated to the services involved and carried out at the agreed times, to avoid unplanned interruptions in the areas that depend on them.

No. Grupo Edifica carries out the construction works and supplies and installs non-medical equipment: climate control, lighting, sanitaryware, faucets and fittings, appliances and furniture. When the project requires it, the works are coordinated with the institution's medical equipment suppliers.

Yes. The same method of planning and control of site conditions applies to medical offices, outpatient clinics and health centres of any size, with a scope and budget adjusted to each case.

The technical lead assigned by Grupo Edifica. They are the single point of contact for the management and for those in charge of each service, and they centralise planning, communications and complaints throughout the works.

Montevideo and Maldonado, including Punta del Este, José Ignacio and La Barra.

Contact for healthcare institutions

Let us arrange a meeting with the institution's management to survey the spaces and define a construction plan compatible with patient care.

Step 1 of 2

By submitting this form you accept the Privacy policy. Your data is used solely to respond to your inquiry.

WhatsApp +598 99 962 791directiva@edifica.uy
Offices in Montevideo and Maldonado