# Kitchen renovations

> Kitchen renovations, complete from demolition to appliance installation, in Montevideo and Maldonado.

URL: https://grupoedifica.com.uy/en/renovations/kitchens

## Introduction

Grupo Edifica carries out kitchen renovations in houses and apartments in Montevideo and Maldonado, including Punta del Este, José Ignacio and La Barra. We take on the entire works, from demolition and renewal of installations through to fitting wall coverings, countertops, cabinetry and appliances, under technical direction that coordinates all trades.

The kitchen is the room in a home that brings together the most trades in the fewest square metres: masonry, plumbing, electrical, gas where applicable, wall coverings, cabinetry, countertops, appliances and lighting. Each one depends on the measurements and decisions of the one before.

## Kitchen renovation and kitchen design

This page describes the construction works. The design of the kitchen cabinetry, with its layout, detail drawings, renders and selection of materials, is developed within the interior design service. Both can be contracted separately or as an integrated package.

When they are integrated, the design defines from the outset the location of every appliance, drain, socket and light point, and the works are carried out to those measurements. The cabinetry is designed by Grupo Edifica, which quotes it with manufacturers, supervises its manufacture and coordinates its installation.

## What a kitchen renovation includes

- Demolition and removal of existing cabinetry, wall coverings and appliances
- Layout reconfiguration, opening onto the living area or creation of new openings where the project requires it
- Plumbing: hot and cold water supply, and drainage
- Electrical installation: circuits, sockets for each appliance and lighting points
- Gas installation, where applicable, by licensed installers
- Provision for ventilation and the range hood outlet
- Rendering, wall levelling and subfloors
- Flooring and wall coverings
- Countertops
- Cabinetry installation
- Appliances: oven, cooktop, range hood, refrigerator, dishwasher and microwave, among others
- General and under-cabinet lighting
- Painting and final finishes

## How a kitchen renovation is carried out

The order of the work determines the result. Each stage leaves the conditions the next one needs: measurements, levels, plumb lines and connection points.

### 01. Site survey and design

Survey of the condition of the kitchen and its installations, and definition of the scope, cabinetry and appliances. Once the appliances are defined, their dimensions, power ratings and connection requirements are known.

### 02. Demolition

Removal of cabinetry, countertops, wall coverings and, where applicable, partitions. Adjacent rooms are protected and debris is removed.

### 03. Installations

Plumbing, electrical and gas conduits are installed in the exact positions set by the design, before walls and floors are closed. This is the stage that does not allow later corrections without breaking through again.

### 04. Masonry and wall coverings

Rendering, subfloors, levelling, waterproofing in wet areas, flooring and wall coverings. Walls must be plumb and floors level so that the cabinetry and countertops sit correctly.

### 05. Final measurement and manufacture

Once the main construction work is complete, final measurements are taken for the manufacture of the cabinetry and countertops.

### 06. Assembly

Installation of the cabinetry, fitting of countertops, connection of the sink and faucets and fittings, and installation of appliances and lighting.

### 07. Finishes and handover

Painting, adjustments, testing of every installation and every appliance, cleaning and handover.

## Why a kitchen renovation needs a single party in charge

When the construction, cabinetry, countertop and appliances are contracted with different suppliers, problems arise in the handovers between them.

Grupo Edifica centralises those decisions. The technical direction sets the order of the trades, checks measurements at each transition and is responsible for ensuring that what is built matches what was designed. The owner deals with a single point of contact.

- Sockets and drains that do not match the final position of the appliances
- An appliance that does not fit the planned module because the model was changed
- A range hood with no ventilation outlet provided in the works
- Cabinetry manufactured to measurements taken before the wall coverings were finished
- A countertop that cannot be fitted because the base unit is not level
- Each supplier waiting on another, and works that drag on

## Appliances and lighting integrated into the works

Appliances are selected independently of brands. Defining them at the start of the project makes it possible to size circuits, locate sockets and drains, and design the cabinetry around the dimensions of each appliance. Grupo Edifica manages the manufacturer's warranty throughout its term and responds directly to any installation faults.

## Team

More than 25 years of combined experience in construction, site management, technology and project management. In-house construction and installation team.

Track record in the comprehensive fit-out of residential buildings for real estate developers such as Kaplan and OX Desarrollos.

## Frequently asked questions

### What does a kitchen renovation include?

It includes demolition, renewal of plumbing and electrical installations, gas installation where applicable by licensed installers, wall coverings, flooring, countertops, cabinetry installation, appliances and lighting, with technical direction and coordination of all trades by Grupo Edifica.

### What is the difference between a kitchen renovation and kitchen design?

The renovation is the construction work: demolition, installations, wall coverings, assembly and equipment. Kitchen design is the design of the cabinetry and the space, with detail drawings, renders and selection of materials. They can be contracted separately or integrated into a single project.

### Do you manufacture the kitchen cabinetry?

No. Grupo Edifica designs the cabinetry, quotes it with manufacturers, supervises its manufacture, coordinates its installation and manages the after-sales service.

### Why is it advisable to choose the appliances before the works begin?

Because their dimensions, power ratings and connections determine the location of sockets, drains and the range hood outlet, as well as the design of the cabinetry modules. Choosing them later forces the works or the cabinetry to be adapted.

### Can the kitchen be opened onto the living area?

Yes, when the partition to be demolished is not structural or when the design resolves the new opening. In apartments, the position of the building's risers and ducts conditions the new layout.

### Who carries out the gas installation?

Licensed installers, coordinated by Grupo Edifica's technical direction within the construction sequence.

### In which areas do you carry out kitchen renovations?

In Montevideo and in Maldonado, including Punta del Este, José Ignacio and La Barra.

---