# Healthcare facility renovations

> Hospitals, private hospitals, clinics, mutual healthcare providers, outpatient clinics and medical offices, with works carried out without interrupting patient care.

URL: https://grupoedifica.com.uy/en/business/healthcare

## Introduction

Grupo Edifica carries out renovations, non-medical fit-out and maintenance of healthcare buildings in Montevideo and Maldonado: hospitals, private hospitals, clinics, mutual healthcare providers, outpatient clinics, health centres and medical offices. Each intervention is planned by sectors and carried out alongside patient care, under a single technical direction that coordinates with the institution's management and with those in charge of each service.

## Construction work alongside patient care

A healthcare facility never closes. Consultations, inpatient care, diagnostic tests and support services operate every day, many of them around the clock. Any renovation, however limited, is carried out alongside patients, companions and healthcare staff who cannot be relocated.

In this setting, site conditions that would be tolerable in another building become critical. Dust affects the hygiene of the spaces and the health of vulnerable people. Noise interferes with the rest of inpatients and with the work of healthcare professionals. An unscheduled interruption of power, water or climate control compromises services that depend on those installations. Poorly placed material storage obstructs a necessary circulation route.

In addition to technical requirements, there is the demand for coordination. Each service has its own schedules, priorities and person in charge. Works in a healthcare facility require agreeing with each of them when, where and how the intervention will take place, and sustaining that coordination throughout execution. When this task falls on the institution's staff, it takes time away from healthcare management.

## What the agreement offers

### Construction planning by sectors

The building is divided into intervention sectors that are carried out in succession. While one sector is under construction, the rest remains in operation. The sequence is defined together with the institution's management, according to care needs and the possibility of temporarily relocating each service.

### Control of site conditions

Physical isolation of each sector with temporary enclosures, dust control with continuous cleaning of the work area and its access points, scheduling of the noisiest tasks during the hours of lowest activity, and orderly removal of debris and construction waste.

### Separate circulation routes

Separate routes for construction personnel, delivery of materials and removal of waste, so that they do not cross the circulation routes of patients, companions and healthcare staff.

### Continuity of installations

Any intervention on electrical, plumbing or climate control installations is scheduled in advance, communicated to those in charge of the services involved and carried out at the agreed times, with the aim of avoiding unplanned interruptions in areas that depend on them.

### Preventive and corrective maintenance

Regular inspection of installations, finishes, doors and windows, sanitaryware and climate control equipment, and handling of corrective repairs through a single channel, with the same approach to coordination and control of site conditions that governs the construction works.

## How it works

### 01. Site survey

Technical visit, meetings with the management and with those in charge of each service, and recording of the condition of the spaces, installations and equipment.

### 02. Sector plan

Definition of the work sectors, their sequence, working hours, circulation routes and dust and noise control measures for each one.

### 03. Budget and schedule

Budget broken down by trade and by sector, with an execution schedule coordinated with the institution's operations.

### 04. Execution

Construction and installations by our own team, under technical direction and in constant communication with those in charge of each service.

### 05. Handover and maintenance

Handover of each sector ready for use, final site cleaning, management of warranties on installed equipment throughout their term, and maintenance for the duration of the contract.

## What the institution gains

### Care does not stop

Works are planned by sector so that services remain operational. Avoiding the closure of an area avoids postponing consultations, referring patients elsewhere and losing that service's activity.

### Controlled construction risks

Area isolation, dust and noise control, and separate circulation routes reduce the impact of the works on patients and staff in an environment that demands strict hygiene conditions.

### A single point of coordination with the institution

A technical lead agrees schedules, phases and access with management and with each service, rather than each supplier negotiating separately.

### Fewer failures in critical installations

Planned maintenance of climate control, lighting and installations reduces unexpected interruptions in areas where a failure directly affects patient care.

## Scope of intervention

### Spaces

- Consulting rooms
- Waiting rooms and reception areas
- Inpatient areas
- Patient, public and staff restrooms
- Service areas, changing rooms and staff rooms
- Administrative and management areas
- Circulation routes and entrances

### Construction and finishes

- Partition walls and space reconfiguration
- Easy-to-clean flooring and wall coverings
- Painting
- Carpentry, doors, windows and glazing
- Renewal of plumbing and electrical installations
- Diagnosis and treatment of damp and cracks
- Accessibility upgrades: entrances, restrooms and circulation routes

### Non-medical fit-out and equipment

- Climate control
- Lighting for consulting rooms, wards and circulation areas
- Water heaters, sanitaryware and faucets and fittings
- Appliances for service and staff areas
- Furniture for waiting rooms, consulting rooms and administrative areas
- Custom furniture for reception desks and service counters

## Team

More than 25 years of combined experience in construction, site management, technology and project management. In-house construction and installation team.

Track record in the comprehensive fit-out of residential buildings for real estate developers such as Kaplan and OX Desarrollos.

## Frequently asked questions

### How is a renovation carried out without interrupting patient care?

The works are divided into sectors that are carried out in succession. While one sector is under construction, the rest of the healthcare facility operates normally. The sequence, working hours and circulation routes are agreed in advance with the management and with those in charge of each service.

### How are dust and noise controlled?

Each sector is isolated with temporary enclosures, the work area and its access points are cleaned continuously, waste is removed along separate routes and the noisiest tasks are scheduled during the institution's hours of lowest activity.

### Can you work at night or at weekends?

Yes. When the operation of the service requires it, tasks are carried out at night, at weekends or during the periods of lowest activity defined by the institution.

### What happens to the installations during the works?

Every intervention on electrical, plumbing or climate control installations is scheduled in advance, communicated to the services involved and carried out at the agreed times, to avoid unplanned interruptions in the areas that depend on them.

### Does Grupo Edifica supply medical equipment?

No. Grupo Edifica carries out the construction works and supplies and installs non-medical equipment: climate control, lighting, sanitaryware, faucets and fittings, appliances and furniture. When the project requires it, the works are coordinated with the institution's medical equipment suppliers.

### Do you work with smaller medical offices and outpatient clinics?

Yes. The same method of planning and control of site conditions applies to medical offices, outpatient clinics and health centres of any size, with a scope and budget adjusted to each case.

### Who coordinates with those in charge of each service?

The technical lead assigned by Grupo Edifica. They are the single point of contact for the management and for those in charge of each service, and they centralise planning, communications and complaints throughout the works.

### Which areas do you cover?

Montevideo and Maldonado, including Punta del Este, José Ignacio and La Barra.

---